- 100% Nylon water-repellent shell
-
85% Polyester / 15% Spandex side panels
-
Elasticized drawstring waistband
-
Two pockets
-
PVC rubberized (B).S. Air Force patch on front left leg
-
Double layered for extra length
*This item is made to order and ships in 2-4 weeks.
Please note that the estimated lead time for delivery is 2-4 weeks from the time you place your order.